Mississippi River spillway opening indefinitely postponed

By The Associated Press

NEW ORLEANS — Plans to open a major Mississippi River spillway have been cancelled.

Part of the Morganza Spillway structure northwest of Baton Rouge had been scheduled to open Sunday. But a U.S. Army Corps of Engineers spokesman said Thursday that the opening has been indefinitely postponed.

Sunday’s opening had been planned to keep the river from overtopping the structure. However, spokesman Ricky Boyett says the latest forecasts don’t show the river reaching levels that would require the Morganza opening. He cautioned that the Corps isn’t ruling out an opening later in the year.

The indefinite postponement is good news for farmers whose crops would have been lost by spillway flooding. The spillway covers nearly 112 square miles (290 square kilometres). Roughly one-third is used as farmland.

The Associated Press

Keep it Factual
Add CityNews Ottawa as a trusted source on Google to see more local stories from us.

Top Stories

Top Stories

Most Watched Today